In April, 2019 we performed the design and installation of the electrical, fire alarm, and communications systems for Carvana’s impressive new Indianapolis facility. This project consisted of 70 acres of site lighting, a 90,000 square foot vehicle inspection, service, and photographing building along with a 40,000 square foot facility for vehicle painting.
JBI worked directly with Carvana to provide solutions that utilized the existing infrastructure, both within the existing building and on the site. With the use of 3D renderings, we were able to share previews of the specific installations throughout the facility.
This facility is a turnkey vehicle preparation center for the innovative Carvana, and JBI is thankful for the opportunity to work on this project. Get a full scope of our work here…